![]() |
The NEW FORMULA Triple Chrome Plating Kit |
|
|
New Formula which makes the operating range of Chrome plating
much easier; even the novice can do this! The 3 step chrome plating kit
has been designed to provide a show quality nickel, copper & chrome
plate on items such as headlights, bezels, bumperettes, nuts &
bolts, brackets, etc. It can be applied to copper; steel, brass, and
with a pot metal primer or Pot Metal
Nickel, zinc die cast substrates. There are three different processes, each with
its own tank & chemicals, as well as an Electro cleaning/ Electro
stripping tank. The chrome plate is always applied over a nickel plate,
which will fuse to most metals quite readily. The copper plating system
is used as a hi-build filler to cover blemishes, pits and scratches. The
copper plate can be built up to thickness' of 1/8", and solder-it
or Pit Stop can be used to fill in deeper pits. The solder and plate is then
sanded/polished and re-plated before nickel plating. This is an
invaluable tool for the restorer! The nickel-plating system can be either the Pot Metal
Nickel or Regular Nickel. This will readily accept the final layer of
chrome plate. The power source may be either a 6v or 12v battery or
charger. Current is regulated using bulbs, a salt-water rheostat made
from 2 metal plates and a small container of salt water, or a plating
rectifier. A small quantity of battery acid and hydrochloric acid is
required. Nickel-plating process will take approx. 30-60 minutes. Copper
plate operation will take from 10 minutes to several hours if building
up thick layers. The final Chrome layer takes only 4 minutes. Nickel & Copper kits will plate approx. 20 to100 square feet of surface area depending on kit size before the anodes need replacing. The Chrome solution will plate over 2000 sq. ft of decorative chrome, & for most operations should not need replacement. Solutions last over the life of many sets of anodes and are not usually disposed of. Procedures for handling these minimal quantities are outlined in the manual. There are no cyanides in these systems. A system of fume control for the chrome, consisting of fume control balls and a chemical mist and fume suppressant is included with every kit. Full instructions for fume control are discussed in the manual.
|
||
|
Triple Chrome Kit |
1 Gallon |
2 Gallon |
4 gallon |
8 gallon |
|
Contents: Tanks
SD
KLENE 175
SD
KLENE 416
Anodise
and Chrome Stripper
Nickel
Salts
Copper
Salts
Chrome
Salts
Nickel
Anode 6 x 4 & Bandage
Copper
Anode 4 x 8 & Bandage
GP
Plates 6 x 9
Heaters
300 watt + Thermostat Heaters
Ceramic 300 watt (boiling heaters) Mist
Suppressant
Fume
control balls
The Complete Plating Manual |
UKTCK1 6 litre x 4 500g 500g 500g 1 gal 1 gal 1 gal 1 1 1 1 - 1 1 1 |
UKTCK2 11 litre x 4 500g 500g 500g 2gal 2gal 2gal 2 2 2 1 - 1 1 1 |
UKTCK4 25 litres x 4 1kg 1kg 1kg 4gal 4gal 4gal 2 2 2 1 1 2 2 1 |
UKTCK8 60 litres x 4 1kg 1kg 2kg 8gal 8gal 8gal 4 4 4 1 1 3 3 1 |
|
|
£292.25 |
£437.25 |
£708.00 |
£1271.00 |